Welcome to the Emploi beta! The service is open to job seekers first, and features for companies open during autumn 2026.

Emploi
Log in
  1. Home
  2. Professions
  3. Concrete finisher

Concrete finisher jobs in Finland

Concrete finishers work with binding agents like cement and concrete. They put up any removable forms and pour concrete into the forms. They then execute one or several actions to finish the concrete: cutting, screeding or levelling, compacting, smoothing, and chamfering to prevent chipping.

Look for concrete finisher jobs in Finland anonymously!
Make an anonymous profile. Companies can find you by your skills, without seeing your name or photo.
Create a free profile

Concrete finisher – how much is the pay in Finland?

What the trade paid in 2024

Hourly earnings in Finland 2024 — occupation group 7114 Concrete placers, concrete finishers and related workers, Statistics Finland table 15az, CC BY 4.0.
Median20.26 €/h
Bottom tenth14.84 €/h
Top tenth28 €/h
Employees1,724

Concrete finisher - Which skills are essential?

Apply ergonomy principles in the organisation of the workplace while manually handling equipment and materials.

Pour concrete into a form from a mixer truck chute, hopper or hose. Pour the correct amount to balance efficiency with the risk of the concrete not setting completely.

Bring construction materials, tools and equipment to the construction site and store them properly taking various aspects into account such as the workers' safety and protection from deterioration.

Work as part of a team in a construction project. Communicate efficiently, sharing information with team members and reporting to supervisors. Follow instructions and adapt to changes in a flexible manner.

Check the quantity and quality of delivered concrete. Make sure that the concrete will withstand any expected pressures.

Use compact concrete mixers or various ad-hoc containers such as wheelbarrows to mix concrete. Prepare the correct quantities of cement, water, aggregate and optional added ingredients, and mix the ingredients until an homogenous concrete is formed.

Consult utility companies or plans on the location of any utility infrastructure that may interfere with a project or be damaged by it. Take the necessary steps to avoid damage.

Visually inspect a concrete structure to see if it is structurally sound. Check for different types of cracks, such as those due to reinforcement corrosion, impact damage or high water content.

Remove concrete forms after the concrete has cured fully. Recuperate materials if possible, cleaning it and taking the right steps to store it for later reuse.

Apply the relevant health and safety procedures in construction in order to prevent accidents, pollution and other risks.

Monitor the process where the poured concrete cures or sets. Make sure the concrete does not dry too quickly, which may cause cracking. Rehumidify the concrete when called for.

Set up forms out of wood, plywood, various plastics, or other suitable materials to form concrete into supportive columns or walls. Place sheathing delineating the shape of the planned structure and use supportive constructions, usually incorporating wales, cleats and stakes, to keep the sheathing firmly in place as the concrete cures.

Use a variety of techniques on a wood surface to ensure it is free of dust, sawdust, grease, stains, and other contaminants.

Recognise the symptoms of metal showing oxidation reactions with the environment resulting in rusting, copper pitting, stress cracking, and others, and estimate the rate of corrosion.

Use different measurement instruments depending on the property to be measured. Utilise various instruments to measure length, area, volume, speed, energy, force, and others.

Monitor the situation around you and anticipate. Be ready to take quick and appropriate action in case of unexpected events.

Use elements of protective clothing such as steel-tipped shoes, and gear such as protective goggles, in order to minimise risk of accidents in construction and to mitigate any injury if an accident does occur.

Smooth the surface of freshly poured concrete using a screed.

Concrete finisher - Which skills are useful but not essential?

Inspect heavy equipment for construction projects before each use. Maintain the machine in good working order, taking care of small repairs and alerting the responsible person in case of serious defects.

Manually or automatically sort waste by separating it into its different elements.

Apply specialised membranes to prevent penetration of a structure by dampness or water. Securely seal any perforation to preserve the damp-proof or waterproof properties of the membrane. Make sure any membranes overlap top over bottom to prevent water from seeping in. Check the compatibility of multiple membranes used together.

The shapes, construction methods and purposes of different types of concrete forms, including special forms like sliding and climbing formwork. Suitable materials for forms and any products or coatings used to enhance the properties of the form.

The types of machines used to pump liquid concrete such as the boom concrete pumps used for large construction projects or line pumps generally used for small-scale works.

Use different types of drywall sanders, automatic or manual, handheld or on an extension, to sand surfaces to a smooth finish or to rough them up for better adhesion.

Finish concrete using a variety of techniques like polishing and acid staining.

Install insulation materials shaped into blocks on the outside or inside of a structure. Attach the blocks using an adhesive and a mechanical fixing system.

Safely attach loads to different types of hooks and attachments, taking into account the weight of the load, the power available to move it, static and dynamic tolerances of all instruments and materials, and the mass distribution of the system. Communicate with the operator verbally or with gestures to ensure the safety and efficiency of the operation. Detach loads.

Evaluate how much stock is used and determine what should be ordered.

Check construction supplies for damage, moisture, loss or other problems before using the material.

Operate various types of mechanic and manual road rollers, pieces of equipment used to compact surfaces.

Make sure the planned surface has the necessary slope to prevent puddling of water or fluids.

Take measurements on site and estimate the amount of materials required for the construction or restoration project.

Feed hoppers with the required materials using various tools such as lifting equipment or shovels.

Order required materials for the construction project, taking care to purchase the most suitable material for a good price.

Maintain required company records and forms in order to report any defective materials or questionable conditions of manufacturing machinery and equipment.

Receive incoming construction supplies, handle the transaction and enter the supplies into any internal administration system.

Interpret and understand plans and drawings in manufacturing processes which include representations in three dimensions.

Drive movable heavy equipment used in construction. Load the equipment onto low loaders, or unload it. Judiciously drive equipment on public roads when required.

Maintain records of the progress of the work including time, defects, malfunctions, etc.

Spray foam insulation, usually polyurethane, to fill a space.

Interpret and understand plans and drawings in manufacturing processes which include representations in two dimensions.

Tie together bars of reinforced steel or rebar to ensure stability of the structure before concrete is poured. Use metal wire to tie the bars together at every second, third or fourth intersection as required. Use the standard flat tie or more advances ties such as saddle ties and figure 8 ties to support heavier loads such as workers standing or climbing on the rebar structure.

Set up a variety of temporary infrastructure used on building sites. Put up fences and signs. Set up any construction trailers and make sure that these are connected to electricity lines and water supply. Establish supplies stores and garbage disposal in a sensible manner.

Take necessary precautions and follow a set of measures that assess, prevent and tackle risks when working at a high distance from the ground. Prevent endangering people working under these structures and avoid falls from ladders, mobile scaffolding, fixed working bridges, single person lifts etc. since they may cause fatalities or major injuries.

Work with concrete mixer trucks. Drive the truck and operate controls. Keep track of time. Take the necessary steps to evacuate the concrete upon arrival at the site, either alone using a full range chute, or with help when using a rear chute.

Guide the concrete hose while the pump is operating. Make sure to distribute the concrete efficiently and securely.

Set up reinforcing steel, or rebar, to be used for reinforced concrete construction. Set mats and columns securely in place to prepare for concrete pouring. Use separator blocks called dobies to keep the construction from the ground.

Look for concrete finisher jobs in Finland anonymously!
Make an anonymous profile. Companies can find you by your skills, without seeing your name or photo.
Create a free profile

Sources

Wage data: Statistics Finland, wage structure statistics, table 15az, year 2024. Read 2.10.2026. Licence CC BY 4.0.

This service uses the ESCO classification of the European Commission.

How we calculated these figures